Roy Hill Reverse Osmosis Plant
Roy Hill required the delivery of the Blended Water Treatment Plan (BWTP) for a life of mine balanced water management system at the Principal’s Roy Hill mine site.
Roy Hill required the delivery of the Blended Water Treatment Plan (BWTP) for a life of mine balanced water management system at the Principal’s Roy Hill mine site.
Inoteq were contracted to complete the supply and installation of 3 x tank and pump transfer stations at the Eliwana mine site for FMG.
Stockyard Hill Wind Farm was developed by Goldwind Australia, consisting of 149 turbines with a total capacity of 530 MW with a potential to power up to 390,000 homes annually.
OZ Minerals developed the Carrapateena Copper – Gold deposit in South Australia on the eastern edges of the Gawler Craton.
Inoteq were initially contracted by Roy Hill to install and commission a Turkeys Nest at the Roy Hill mine site. Inoteq were subsequently awarded a dewatering MSA to install upcoming dewatering requirements, along with maintaining existing pipelines and bore pump infrastructure.
Inoteq were contracted by the Department of Communities to design, supply and install a new ground water tank, pump Sstation and associated pipework for the town water supply at the Wakathuni Community in the Pilbara.
FMG works across multiple Iron Ore Mine sites in the Pilbara Region of Western Australia. Inoteq was contracted late 2017 to commence the dewatering requirements across FMG’s Chichester, Solomon and late Eliwana sites.