Eliwana Water Infrastructure

Site Location: Eliwana Minesite, Pilbara Region WA
Client: FMG
Duration: January 2020 – December 2020

Inoteq were contracted to complete the supply and installation of 3 x tank and pump transfer stations at the Eliwana mine site for FMG.

The scope included the design, procurement, transportation, construction, testing and commissioning of all civil, mechanical, piping, electrical and instrumentation works for the newly constructed OPF, administration and TLO facilities. The works included:
• Above ground tanks,
• Raw water and fire water pump stations,
• Switchboards and
• All the HDPE and teel interconnecting pipework.

The project faced many challenges including changes to design, interface with multiple contractors on site, logistics and access delays. Despite this, Inoteq completed the works on time and on budget to an extremely high standard.